The project
Representing 105 municipalities in the province of Trento, it has promoted a feasibility project to establish an ERC in the area by identifying an area of five municipalities where a scientific methodology can be applied that can then be replicated throughout the territory. The identified interventions have a production capacity of 2 MWp capable of meeting 53 percent of the energy needs of participating municipalities immediately.
Project carried out in technical partnership for Sinloc.
BIM – Mountain Watersheds
They are aggregators of municipalities within a natural perimeter around rivers. They are realities that redistribute economic resources recovered from the collection and use of surcharges owed by concessionaires of large water derivations for hydroelectric power generation. In Trentino, two BIMs are promoters of CER of the territory with the intention of developing an economy with distributed generation of renewable sources (sun and water) and redistribute the benefits within the territory with the municipalities they represent.